WP-3
WashingTrommel · MSI Mining T5x Trommel · 200 yd³/h rated · Dominion Creek
Last seen 14:51:39
Digital twin
Live plant view
Feed, trommel speed, water and hopper level follow live telemetry. Drag to rotate, scroll to zoom.
Washing
Current cut
Cut 7 · Bench 2
Frozen muck over gravel
Grade
0.035 oz/yd³
Rated capacity
200 yd³/h
Design water
2,000 gpm
Sluice slope
2.1 in/ft
Season runtime
1,562 h
Last cleanup
11-15 17:46
Next cleanup
in 10m 00s
Process
Live process values
Feed rate
167yd³/h
Process water
1,903gpm
Trommel
9.5rpm
Pump pressure
77psi
Hopper
47%full
Recovery rate
5.88oz/h
Recovery
Gold today
37.5 oz
34%
Yards goal
0.035
Grade
5.88
oz/h
Production
Yards washed today
1,064
yd³ of 3,176 planned · 6.7 h washing since 07:00
Average feed
159 yd³/h
Utilisation
79% of rated
Hours today
6.7 h
Per hour
Yards washed and ounces recovered today
Production day starts at 07:00.
Yards · yd³
Gold · oz
Alarms
Alarms (1)
Sluice flow below setpoint
2026-11-14 22:43
Process history
Feed rate, process water and trommel speed
Feed rate · yd³/h (rated 200)
Process water · gpm
Trommel · rpm