WP-2
MaintenanceTrommel · MSI Mining T5x Trommel · 350 yd³/h rated · Dominion Creek
Last seen 14:31:17
Digital twin
Live plant view
Feed, trommel speed, water and hopper level follow live telemetry. Drag to rotate, scroll to zoom.
Maintenance
Current cut
Cut 8 · Bench 3
Creek gravel, boulders
Grade
0.032 oz/yd³
Rated capacity
350 yd³/h
Design water
3,500 gpm
Sluice slope
2.5 in/ft
Season runtime
1,642 h
Last cleanup
11-15 16:47
Next cleanup
in 14h 15m
Process
Live process values
Feed rate
—yd³/h
Process water
—gpm
Trommel
—rpm
Pump pressure
—psi
Hopper
8%full
Recovery rate
—oz/h
Recovery
Gold today
19.5 oz
11%
Yards goal
0.032
Grade
0.00
oz/h
Production
Yards washed today
614
yd³ of 5,579 planned · 2.2 h washing since 07:00
Average feed
279 yd³/h
Utilisation
80% of rated
Hours today
2.2 h
Per hour
Yards washed and ounces recovered today
Production day starts at 07:00.
Yards · yd³
Gold · oz
Alarms
Alarms (3)
Sluice flow below setpoint
2026-11-16 09:32
Nugget trap full
2026-11-15 09:15
Process water pressure low
2026-11-15 08:40
Process history
Feed rate, process water and trommel speed
Feed rate · yd³/h (rated 350)
Process water · gpm
Trommel · rpm