IMM-02

Running

Husky Hylectric 225 · 220 t clamp force · Oyonnax Plant

Last seen 14:51:41

All presses
Digital twin
Live machine view
Animated from live telemetry: cycle time, status and hopper level. Drag to rotate, scroll to zoom.
Running
Current job
housing cover

Mold

M-1802

Material

TPE

Cavities

4

Shot weight

305.4 g

Target cycle

10.3 s

Next maintenance

23d 10h

Process
Live process values

Cycle time

12.15s

Melt temp.

246°C

Mold temp.

57°C

Injection

1,526bar

Hold pressure

820bar

Hopper

87%full
Efficiency
OEE
66%

85.5%

Availability

85.0%

Performance

91.0%

Quality

Production
Today's output

5,742

shots of 21,390 planned · 22,968 parts

Scrap rate

0.55%

Scrap shots

32

Goal progress

27%

Shots per hour
Good and scrap shots today
Production day starts at 06:00.
Alarms
Alarms (1)

Melt temperature above limit

2026-11-15 09:52

Medium
Process history
Cycle time, scrap and melt temperature

Cycle time · s (target 10.3 s)

Scrap · %

Melt temperature · °C