EX-01
WorkingExcavator · Caterpillar 390F (2019) · 8,866 h · Scroggie Creek
Last seen 15:01:29
Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-1
Operator Helder Ribeiro
Wash plant
s-scr-wp1
Hours today
6.6 h
Cycle time
30s
Cycles today
557
Engine hours
8,866 h
Next service
in 307 h
Telemetry
Live readings
Engine speed
1,709rpm
Coolant
90°C
Hydraulic oil
72.9°C
Hydraulic pressure
320bar
Bucket fill
86%
Fuel burn
58.2L/h
Fuel
Tank level
35%
348 L
In tank
58.2 L/h
Burn
6.0 h
Range
Utilisation
Hours on this shift
6.6 h
of a 12 h shift · 55% utilisation
Load
86%
Engine speed
1,709 rpm
Coolant
90 °C
Per hour
Utilisation and fuel burned today
Production day starts at 07:00.
Utilisation · %
Fuel · L
Alarms
Alarms (0)
No alarms on this unit in the last 48 hours.
Engine history
Engine speed, coolant and fuel level
Engine speed · rpm
Coolant · °C
Fuel level · %